Published: 29.10.2024
Today, Tuesday, October 29, we reassembled the flat roof system after the roof renovation. During the assembly, we found 2 defective modules. Otherwise, the work went quite smoothly with three of us working together; first, the basic structure was assembled and aligned, then the wiring was prepared and jumper cables and MC4 connectors were pressed onto the cables. After that, the installation of the modules began. Because the roof now has less gravel on it than before, this caused issues with the fall ventilation and roof drainage, which were now too high and had to be shortened by 10 cm. These tasks also made the workday interesting and varied. The coffee that the hostess brought us for the afternoon snack was of course the cherry on top.