elektriker
elektriker
vakantio.de/elektriker

Charging infrastructure

Published: 04.11.2024

On Wednesday, October 30th, I had the opportunity to participate in the installation of charging infrastructure in an existing underground garage. Early in the morning, I was thrown into the deep end and quickly learned to mount the flat band adapters and connect the 5x16 cables. Together with the trainee, we cut and installed the aluminum pipes for the cable supply as well as for the antenna cables of the 5G router. The proper cleaning of the ends of the aluminum pipes and the assembly of the end caps were, of course, completed with care. For the network supply to the access point, we searched for and found a connection in the existing installation, which allowed us to finish the installation more quickly and successfully carry out the final tests. It was fun to connect theoretical knowledge with practical experience. I noticed that I can still install things easily; learning is indeed learning.

Answer

Switzerland
Travel reports Switzerland