Pubblicato: 27.10.2024
On Thursday morning, we completed the installation of the wall boxes. Additionally, a tariff cable needed to be pulled through for a later disconnection. The old asbestos cement meter panel was professionally dismantled and replaced with a new one made of PVC. The apprentice in the second year and I made a great team; the pulling of the cable through the old existing pipes went perfectly. The commissioning of the wall boxes, including the programming of load management and the initial inspection in the afternoon, was finished a bit earlier, so I had time for a short visit to the school.
On Friday, we installed 3 rows of solar modules together, which of course need to be perfectly aligned. See for yourself.
The installation of the solar modules with clamping plates onto the prepared substructure, after careful measurement, went quickly from there.