It's starting slowly
Planning and preparation are mostly complete; bridge and lock closures are scheduled... then it can start on May 5th or 6th


Published: 06.05.2026
Punctually set off from the harbor at 09:40, so I was able to take full advantage of the bridge opening and lock times. The locks and bridges recognized me automatically, with hardly any waiting time.
The weather was cloudy, the wind (3bf) was not too much of a disturbance, and I only got a few raindrops.