

AI - generated example for the tide
Started in Haren/Ems on the DEK downstream, with no wind and little current, hardly any ship traffic (Holiday - Father's Day -), but plenty of 'Father's Day parties' along the...
The continuation through the canals was quite calm, with very few other boats in sight. The locks and bridges were opened very quickly, usually accompanied by someone, sometimes...
Punctually set off from the harbor at 09:40, so I was able to take full advantage of the bridge opening and lock times. The locks and bridges recognized me automatically, with...
The boat tour from Haren (Ems) to Oldenburg on May 12, 2026 takes you along two main waterways: First, you follow the Ems (Dortmund-Ems Canal) downstream to the north, before...
Planning and preparation are mostly complete; bridge and lock closures are scheduled... then it can start on May 5th or 6th
The boat is currently in the water over winter, everything has survived well, and now I can already take advantage of the first warm sun rays for a little 'outing'. Zwartsluis -...
The rough itinerary is set; I will choose layovers and ports on-site as I please, or I may happily rely on experiences and tips.