18th Day of Transit through the Panama Canal 12.12.2025
Transit through the Panama Canal with our ship, 294m long, 32.5m wide, and approximately 8.1m draft. Duration 8 - 10 hours.Under the Atlantic Bridge, to the 3-fold Gatun Locks,...


Published: 18.12.2025
Due to ongoing unrest, for safety reasons, disembarking in Ecuador is not possible. Therefore, only the skyline of Manta can be seen from afar.
Equator crossing on 14.12.2025.
Continuation to Peru.