And we continue...

Wɔatintim: 26.07.2023

And once again we are on the road. This leg takes a little over three hours.

However, right at the beginning there was already a 30-minute delay. The exit from the campsite was blocked by an excavator loading a truck.

But let's talk about the roads. It's great that you don't have to pay for the highways, but the condition of the roads is really bad and the quality of the road repairs leaves something to be desired.
Anoyie

Germany
Akwantuo ho amanneɛbɔ Germany